[1] Fang, H. W., "Three - Dimensional Calculations of Flow and Suspended Sediment Transport in the Neighborhood of the Dam for the Three Gorges Project (TGP) Reservoirs in the Yangtze River", Journal of Hydraulic Research, 2003, 41 (4), 379-394.
[2] Çelebioğlu, T. K., "Simulation of Hydrodynamics and Sediment Transport Patterns in Delaware Bay", PhD Thesis, DrexelUniversity, Philadelphia, USA, 2006.
[3] Sabbagh, S. R.," Simulation of Suspended Sediment Transport in Dam Reservoir Using a Cell Center Finite Volume Solver", The 5th IASME International Conference on Fluid Mechanics and Aerodynamics, Athens, Greece, 2007, pp 24-33.
[4] Van Rijn, L. C., "Sediment Transport Part I: Suspended Load Transport", ASCE Journal of Hydraulic Engineering, 1984, (11), 1613-1641.
[5] Falconer, R. A., Chen, Y., "Modeling Sediment Transport and Water Quality Processes on Tidal Floodplains", Floodplain Processes, Editors: Malcolm G. Anderson, Des E. Walling and Paul D. Bates, John Wiley & Sons Ltd.,1996, pp 361-397.
[6] Whitehouse, R., Soulsby, R., Roberts, W., Mitchener, H., "Dynamics of Estuarine Muds", HR Wallingford and Thomas Telford Limited, 2000, pp 1-210.
[7] Lin, B., Falconer, R. A., "Tidal Flow and Sediment Transport Modeling Using the Ultimate Quickest Scheme", ASCE Journal of Hydraulic Engineering, 1997, 123, (4), 303-314.
]8[ گزارش مرحله اول آبگیری سد آیدوغموش، شرکت مشاور بند آب،1384.
]9[ حسنزاده، ی.، "بررسی عوامل مؤثر در ضریب رسوبگیری مخازن سدهای ذخیرهای"، چهارمین سمینار مهندسی رودخانه، اهواز، 1375.