Prioritize Repair of Wastewater Network Using Asset Management Approach (A Case Study: Region Two of Isfahan Wastewater Network)

Authors

Department of Civil Engineering, Faculty of civil engineering and transportation, University of Isfahan, Isfahan, Iran

Abstract

     Generally, using predictive methods for finding critical points and repairing the damage pipes based on these approaches is less costly than renewal them after occurring failure. In this study, by calculating direct costs, two scenarios of “on time repair” (first scenario) and “repair after failure” (second scenario) are proposed to repair the wastewater network pipe. As a case study, part of Isfahan wastewater network (region 2) and its failure data during 1393 to 1396 are considered and the obtained results are presented and compared.

Keywords

Main Subjects


باباخانی م، احمدی مطلق ا ر، میراحمدیان ب، "روش محاسبه هزینه ­های اجتماعی در اجرا و بازسازی شبکه ­های فاضلاب"، دومین همایش ملّی آب و فاضلاب با رویکرد بهره ­برداری، دانشگاه علم و صنعت ایران، 1387.
حسینقلی پ، معینی ر، زارع م ر، "پیش­ بینی تعداد گرفتگی در شبکه فاضلاب شهری (مطالعه موردی: منطقه دو اصفهان)"، مجله آب و فاضلاب، 1399، 31 (1)، 86-98.
راهنمای بهره­ برداری و نگهداری از شبکه جمع ­آوری فاضلاب، دفتر فنی اجرایی معاونت برنامه­ ریزی و نظارت راهبردی ریاست جمهوری، 1388.
رمضانیان­پور ع ا، مودی ف، نامیان م، نقاش طوسی ح، "ارائه یک چارچوب پیشنهادی برای سیستم پشتیبان تصمیم­ گیری در مدیریت دارایی شبکه فاضلاب­ رو"، اولین کنفرانس ملّی مهندسی و مدیریت زیرساخت­ها، 1388.
صالح س م ح، خاکی وطن ر، "مشکلات بهره­ برداری از شبکه فاضلاب و نقش ویدئومتری در بهره ­برداری بهتر از شبکه­ ها"، دومین همایش ملّی آب و فاضلاب با رویکرد بهره ­برداری، 1387.
عنبری م ج، تابش م، "محاسبه احتمال رویداد شکست در شبکه­ ها جمع ­آوری فاضلاب با استفاده از شبکه بیزین"، مجله آب و فاضلاب، 1395، 27 (3)، 48-61.
عنبری م ج، تابش م، "محاسبه پیامد وقوع شکست در شبکه­ های جمع ­آوری فاضلاب"، دهمین کنگره بین ­المللی مهندسی عمران، دانشگاه تبریز، 1394.
فرد مرادنیا س، ایراندوست م، "ویدئومتری در شبکه ­های فاضلاب"، سومین کنگره بین ­المللی عمران، معماری و توسعه شهری، دانشگاه آزاد اسلامی واحد تبریز، 1394.
فهرست بها پایه قنات، سازمان برنامه و بودجه، 1398.
مشخصات فنی و عمومی کارهای خط لوله آب و فاضلاب شهری، سازمان مدیریت و برنامه ­ریزی کشور، 1384.
فهرست بها پایه ابنیه، سازمان برنامه و بودجه، 1397.
Ariaratnam ST, El-Assaly A, Members A, Yang Y, “Assessment of infrastructure inspection needs using logistic models”, Journal of Infrastructure Systems, 2001, 7, 160-165Bauwens W, “Sewer network asset management decision support tools : A Review”, International Symposium on New Directions in Urban Water Management, UNESCO Paris, 2007, 1-8.
Gedam A, Mangulkar S, Gandhi B, “Prediction of sewer pipe main condition using the linear regression approach”, Journal of Geoscience and Environment Protection, 2016, 4, 100-105.
Greta JV,John CM, “Consequence-of-failure model for risk-based asset management of wastewater pipes using AHP”, Journal of Pipeline Systems Engineering and Practice,2019, 10 (2), 04019005.
Guzmán-Fierror J, Charry S, González I, Pena-Heredia F, Hernandez N, Luna-Acosta A, Torres A, “Bayesian network-based methodology for selecting a cost-effective sewer asset management model”, Water Science and Technology, 2020, 81 (11), 2422-2431.
Hashemi B, “Cost of underground infrastructure renewal: a comparison of open-cut and trenchless methods behnam”, In Presented to the Faculty of the Graduate School of The University of Texas at Arlington in Partial Fulfillment of the Requirements for the Degree of MasterASTE of Science in Civil Engineering the University of Texas at Arlington, 2008.
Joseph PE, Strauch A, “Asset Management of Sanitary and Storm Sewer System Components Using Condition Assessmet”, In Pipeline Division Specialty Congress, San Diego, California, United States, 2004, 8, 1-10.
Kabir G, Balekelay N, Balekelay C, Tesfamariam S, Asce M, “Sewer structural condition prediction integrating bayesian model averaging with logistic regression”, Journal of Performance of Constructed Facilities, 2018, 32 (3), 1-10.
Koza J ,Genetic programming: On the programming of computers by means of natural selection, MIT, 1992. Doi: 10.1016/0303-2647(94)90062-0.
Laakso T, Kokkonen T, Mellin I, Vahala R, “Sewer Condition Prediction and Analysis of Explanatory Factors”, Journal of water. 2018, 10 (9), 1-17.
Marzouk M, Osama A, “Fuzzy-Based Methodology for Integrated Infrastructure Asset Management”, Internatinal Journal of Computational Intelligence Systems, 2017, 10, 745-759.
Mailhot A, Poulin A, Villeneuve J, “Optimal replacement of water pipes”, Water Resources Research Journal, 2003, 39 (5), 1-14.
Mcdonald SE, Zhao JQ, “Condition assessment and rehabilitation of large sewers”, International Conference on Underground Infrastructure Research, University of Waterloo, 2001, 361-369.
Silva S, “GPLAB A Genetic Programming Toolbox for MATLAB”, 2007, 72.
Ugarelli R, Di Federico V, Asce AM, “Optimal Scheduling of Replacement and Rehabilitation in Wastewater Pipeline Networks”, Water Resources Planning and Management Journal, 2010, 136, no. June, 348-356.
Van Riel W, Langeveld J, Herder P, Clemens FHLR, “Intuition and information in decision-making for sewer asset management”, Urban Water Journal, 2014, 11, (6), 506-518.
Van Riel W, Van Bueren E, Langeveld J, Herder P, Clemens F, “Decision-making for sewer asset management: Theory and practice”, Urban Water Journal, 2015, 13 (2), 57-68.
Wirahadikusumah R, Abraham DM, Iseley T, Prasanth RK, “Assessment technologies for sewer system rehabilitation”, Automation in Construction Journal, 1998, 7 (4), 259-270.
Yang DM, Su TC, “An optimization model of sewage rehabilitation”, Chinese Institute of Engineers Journal, 2011, 30 (4), 651-659.