Abbasianjahromi H, Sepehri M, Abbasi O, “A decision-making framework for subcontractor selection in construction projects”, Engineering Management Journal, 2018, 30 (2), 141-152.
Beljkas Z, Prascevic Z, Ivanisevic N, Knezevic M, Cvetkovska M, “Application of fuzzy logic on selection of contractors for construction of high rise buildings”, The IOP Conference Series: Earth and Environmental Science, International Scientific Conference “People Buildings and Environment (PBE 2019), Brno, Czech Republic, 17-19 October, 2019.
Borbath M, Blessner P, Olson B, “An empirical approach to the evaluation of defence contractor performance”, International Journal of Logistics Research and Applications, 2019, 22 (2), 138-153.
Borujeni MP, Gitinavard H, “Evaluating the sustainable mining contractor selection problems: An imprecise last aggregation preference selection index method”, Journal of Sustainable Mining, 2017, 16 (4), 207-218.
Cao Q, Esangbedo MO, Bai S, Esangbedo CO, “Grey SWARA-FUCOM weighting method for contractor selection MCDM problem: A case study of floating solar panel energy system installation”, Energies, 2019, 12 (13), 2481.
Cheaitou A, Larbi R, Al Housani B, “Decision making framework for tender evaluation and contractor selection in public organizations with risk considerations”, Socio-Economic Planning Sciences, 2019, 68.
Chiang FY, Vincent FY, Luarn P, “Construction contractor selection in Taiwan using AHP”, International Journal of Engineering and Technology, 2017, 9 (3), 211-215.
De Araújo M, Alencar LH, De Miranda Mota CM, “Decision criteria for contractor selection in construction industry: A literature review”, TheIEEE International Conference on Industrial Engineering and Engineering Management (IEEM 2018), Bangkok, Thailand, 16-19 December, 2018.
De Jesus VM, Gomes LFAM, Filardi F, “The selection of oil & gas projects contract strategies with the ANP: A case study”, Independent Journal of Management & Production, 2019, 10 (2), 355-379.
Demirkesen S, Bayhan HG, “Subcontractor selection with choosing-by-advantages (CBA) method”, The IOP Conference Series: Materials Science and Engineering, 3rd World Multidisciplinary Civil Engineering, Architecture, Urban Planning Symposium (WMCAUS 2018), Prague, Czech Pepublic, 2019.
El-khalek HA, Aziz RF, Morgan ES, “Identification of construction subcontractor prequalification evaluation criteria and their impact on project success”, Alexandria Engineering Journal, 2019, 58 (1), 217-223.
Gupta H, “Evaluating service quality of airline industry using hybrid best worst method and VIKOR”, Journal of Air Transport Management, 2018, 68, 35-47.
Hale B, Azhar S, Noor MA, Khalfan MM, “The solicitation, evaluation, and selection of construction contractors: A case study of US Army Corps of Engineers”, International Journal of Sustainable Real Estate and Construction Economics, 2019, 1 (3), 215-231.
Hasnain M, Thaheem MJ, Ullah F, “Best value contractor selection in road construction projects: ANP-based decision support system”, International Journal of Civil Engineering, 2018a, 16 (6), 695-714.
Hasnain M, Ullah F, Thaheem MJ, Sepasgozar SME, “Prioritizing best value contributing factors for contractor selection: An AHP approach”, The 23rd International Symposium on Advancement of Construction Management and Real Estate (CRIOCM 2018), 24-27 August, Guiyang, China, 2018b.
Jabbarzadeh A, “Application of the AHP and TOPSIS in project management”, Journal of Project Management, 2018, 3 (2), 125-130.
Koçak S, Kazaz A, Ulubeyli S, “Subcontractor selection with additive ratio assessment method”, Journal of Construction Engineering, Management and Innovation, 2018, 1 (1), 18-32.
Lashgari Y, “Proposing a hierarchical approach based on fuzzy logic to choose a contractor in the bank”, International Academic Journal of Science and Engineering, 2017, 4 (2), 28-38.
Lawshe CH, Harris DH, “The method of reciprocal averages in weighting personnel data”, Educational and Psychological Measurement, 1958, 18 (2), 331-336.
Morkunaite Z, Podvezko V, Zavadskas EK, Bausys R, “Contractor selection for renovation of cultural heritage buildings by PROMETHEE method”, Archives of Civil and Mechanical Engineering, 2019, 19 (4), 1056-1071.
Opricovic S, “Multicriteria optimization of civil engineering systems”, PhD Thesis, Faculty of Civil Engineering, Belgrade, Serbia, 1998.
Prascevic N, Prascevic Z, “Application of fuzzy AHP for ranking and selectionof alternatives in construction project management”, Journal of civil engineering and management, 2017, 23 (8), 1123-1135.
Rao MVK, Kumar VSS, Kumar PR, “Optimal contractor selection in construction industry: the fuzzy way”, Journal of The Institution of Engineers (India): Series A, 2018, 99 (1), 67-78.
Rezaei J, “Best-worst multi-criteria decision-making method”, Omega, 2015, 53, 49-57.
Rezaei J, “Best-worst multi-criteria decision-making method: Some properties and a linear model”, Omega, 2016, 64, 126-130.
Singh P, Ruparathna R, “Construction project proposal evaluation under uncertainty: A fuzzy based approach”, Canadian Journal of Civil Engineering, 2019, 1, 1-10.
Taylan O, Kabli MR, Porcel C, Herrera-Viedma E, “Contractor selection for construction projects using consensus tools and big data”, International Journal of Fuzzy Systems”, 2018, 20 (4), 1267-1281.
Zhang SF, Liu SY, Zhai RH, “An extended GRA method for MCDM with interval-valued triangular fuzzy assessments and unknown weights”, Computers & Industrial Engineering, 2011, 61 (4), 1336-1341.